basic algebra mcqs, basic arithmetic algebra mcqs, basic arithmetic mcqs, basic arithmetic mcqs for fpsc, basic arithmetic mcqs online test, basic arithmetic mcqs with solution pdf, basic math for ppsc, basic math mcqs for entry test, basic math mcqs pdf download, basic mathematics diploma sem 1 mcq, basic mathematics diploma sem 1 mcq pdf, basic mathematics mcqs, basic mathematics mcqs for ppsc pdf, basic mathematics mcqs pdf free download, basic mathematics mcqs with answers, basic mathematics mcqs with answers pdf, basic mathematics mcqs with solution, basic mathematics mcqs with solution pdf, basic mathematics mcqs with solution pdf download, basic maths mcq questions, basic maths mcqs, basic maths mcqs for entry test, Basic Maths Mcqs for NTS, basic maths mcqs for nts test pdf, Basic Maths Mcqs NTS, basic maths mcqs pdf, basic maths mcqs with answers, basic maths mcqs with answers pdf, CSS, FPSC, fpsc math mcqs pdf, general mathematics mcqs, general mathematics mcqs with answers, math basic mcqs, maths basic mcq questions, Maths Mcqs, maths mcqs for entry test with answers, mcq basic mathematics, PMS, PMS Test, PPSC, ppsc basic mathematics mcqs, simple arithmetic mcqs, simple mathematics mcqs with answers, simple maths mcqs, SPSC
Spread the love

Basic Maths Mcqs for NTS, FPSC, PPSC, SPSC, CSS, PMS Test : Maths Mcqs are vital for each test. get ready for NTS, FPSC, PPSC, SPSC, CSS, PMS Test Preparation. and any remaining testing administrations. The greater part of the test prospectus contain Mathematics test segment. Here you will track down most significant Mathematics Mcqs. here these Mcqs will help you getting great imprints in this Section. Here you will find most significant Mcqs of Mathematics from Basic to Advance. the absolute most significant sub classes are: Average, Percentage, Problem on Ages, Time and Distance, HCF and LCM, Logarithms, Discount, Interest, Ratio and Proportion, Decimal Fraction and other.

Today in this article i will show you Basic Maths Mcqs. basic mathematics mcqs with solution pdf,basic arithmetic mcqs,basic mathematics mcqs with solution,basic mathematics mcqs,basic mathematics diploma sem 1 mcq.

Read More: English Synonyms Mcqs with Answers

Basic Maths Mcqs for NTS, FPSC, PPSC, SPSC, CSS, PMS Test

Basic Maths Mcqs

Find two number whose sum is 28 and the difference is 4 _____________?

A. 12,16
B. 18,10
C. 15,13
D. 14,12

 

1 acre is equal to ________square foot?

A. 45434 square foot
B. 34343 square foot
C. 43572 square foot
D. 43560 square foot

 

What is the Sum of First 70 even Numbers?

A. 4970
B. 4950
C. 4900
D. 4980

 

What is the Sum of First 70 Odd Numbers?

A. 4900
B. 4970
C. 4960
D. None of these

 

40 is subtracted from 60% of a number, the result is 50. Find the number?

A. 150
B. 140
C. 130
D. 110

85% of a number is added to 24, the result is the same number. Find the number?

A. 150
B. 140
C. 130
D. 160

60% of a number is added to 120, the result is the same number. Find the number?

A. 300
B. 200
C. 400
D. 500

25% of 30% of 45% is equal to__________?

A. 0.03375
B. 0.3375
C. 3.375
D. 33.75

40% of a number is more than 20% of 650 by 190. Find the number?

A. 600
B. 700
C. 800
D. 900

How much is 80% of 40 is greater than 4/5 of 25?

A. 4
B. 6
C. 9
D. 12

How much 60% of 50 is greater than 40% of 30?

A. 18
B. 13
C. 15
D. 20

After decreasing 24% in the price of an article costs Rs.912. Find the actual cost of an article?

A. 1400
B. 1300
C. 1200
D. 1100

If y exceeds x by 20%, then x is less than y by_______?

A. 16%
B. 16 1/3 %
C. 16 2/3 %
D. 16 3/5 %

What percent of 120 are 90?

A. 25%
B. 50%
C. 75%
D. 33%

Today is khadija’s birthday. After one year, she will become two times as she was ten years ago. current age of Khadija?

A. 19
B. 20
C. 21
D. 22

P and Q can complete a work in 15 days and 10 days respectively. They started the work together and then Q left after 2 days. P alone completed the remaining work. The work was finished in__________days.

A. 12
B. 15
C. 22
D. 20

A and B can finish a work 30 days if they work together. They worked together for 20 days and then B left. A finished the remaining work in another 20 days. In how many days A alone can finish the work?

A. 70
B. 50
C. 40
D. 60

A is thrice as good as B in work. A is able to finish a job in 60 days less than B. They can finish the work in___________days if they work together.

A. 18 days
B. 22 ½ days
C. 24 days
D. 26 days

Two taps X and Y can fill a tank in 10 hrs. and 15 hrs.respectively. If the both taps are opened together, the tank will be full in_________?

A. 3 hrs.
B. 4 hrs,
C. 5 hrs.
D. 6 hrs.

A, B and C together earn Rs.150 per day while A and C together earn Rs.94 and B and C together earn Rs.76. The daily earning of C is:__________?

A. 10 Rs,
B. 15 Rs,
C. 20 Rs.
D. 25 Rs.

If 3 men or 4 women can construct a wall in 43 days, then the number of days that 7 men and 5 women take to construct it is :

A. 12 days
B. 14 days
C. 16 days
D. 18 days

If 6 men can make 10 sofas in 2 days, then 8 men can make 8 sofas in__________?

A. 1.8 days
B. 1.5 days
C. 1.2 days
D. 1 day

If 10 workers can make 10 tables in 10 days, then how many days would it take for 5 workers to make 5 tables?

A. 1
B. 5
C. 10
D. 25

If 6 men take 9 days to complete a work, how many men can complete the work in 3 days?

A. 2 men
B. 12 men
C. 9 men
D. 18 men

Assume that 20 cows and 40 goats can be kept for 10 days for Rs.460. If the cost of keeping 5 goats is the same as the cost of keeping 1 cow, what will be the cost for keeping 50 cows and 30 goats for 12 days?

A. Rs.1104
B. Rs.1000
C. Rs.934
D. Rs.121

P takes twice as much time as Q or thrice as much time as R to finish a piece of work. They can finish the work in 2 days if work together. How much time will Q take to do the work alone?

A. 7
B. 8
C. 9
D. 6
Let P takes x days to complete the work
Then Q takes x/2 days and R takes x/3 days to finish the work
Amount of work P does in 1 day = 1/x
Amount of work Q does in 1 day = 2/x
Amount of work R does in 1 day = 3/x
Amount of work P,Q and R do in 1 day = 1/x + 2/x + 3/x = 1/x (1 + 2 + 3) = 6/x
6/x = 2
=> x = 12
=> Q takes 12/2 days = 6 days to complete the work

3 men and 7 women can complete a work in 10 days . But 4 men and 6 women need 8 days to complete the same work . In how many days will 10 women complete the same work?

A. 50
B. 30
C. 40
D. 13

P, Q and R can do a work in 20, 30 and 60 days respectively. How many days does it need to complete the work if P does the work and he is assisted by Q and R on every third day?

A. 10 days
B. 14 days
C. 15 days
D. 9 days

A tank can be filled by a pipe in 20 min. and by another pipe in 60 min. Both the pipes are kept open for 10 min. and then the first pipe is shut off. After this, the tank will be completely filled in__________?

A. 10 min
B. 20 min
C. 30 min
D. 40 min

A is thrice as good a work man as B and takes 10 days less to do a piece of work than B takes. B can do the work in:___________?

A. 15 days
B. 14 days
C. 16 days
D. 30 days

8 children and 12 men complete a certain piece of work in 9 days. If each child takes twice the time taken by a man to finish the work, in how many days will 12 men finish the same work ?

A. 6 days
B. 8 days
C. 10 days
D. 12 days

15 men can build a 500m long wall in 30 days. In how many days can 30 men build a 1.2 km long wall?

A. 48 days
B. 24 days
C. 40 days
D. 36 days

If 28 men can finish a work in 15 days, 21 men can finish the same work in___________?

A. 24 days
B. 14 days
C. 15 days
D. 20 days

Read More: How to Make Money on Fiverr in 2022

C takes 6 days to complete half of a work and D takes 5 days to complete 1/3rd of the same work. They take turns to complete the task. If C works for the first 4 days, in how many days will D complete the rest of the work without the help of C?

A. 10 days
B. 12 days
C. 8 days
D. 9 days

P,Q and R together earn Rs.1620 in 9 days. P and R can earn Rs.600 in 5 days. Q and R in 7 days can earn Rs.910. How much amount does R can earn per day?

A. Rs.40
B. Rs.70
C. Rs.90
D. Rs.100

P and Q can complete a work in 20 days and 12 days respectively. P alone started the work and Q joined him after 4 days till the completion of the work. How long did the work last?

A. 5 days
B. 10 days
C. 15 days
D. 12 days

P can finish a work in 18 days. Q can finish the same work in 15 days. Q worked for 10 days and left the job. how many days does P alone need to finish the remaining work?

A. 8
B. 6
C. 4
D. 2

P can lay railway track between two stations in 16 days. Q can do the same job in 12 days. With the help of R, they completes the job in 4 days. How much days does it take for R alone to complete the work?

A. 9(3/5) days
B. 9(1/5) days
C. 9(2/5) days
D. 10 days

wo pipes X and Y fill a tank in 15 hrs. and 20 hrs. respectively, while a third pipe ‘Z’ can empty the full tank in 25 hrs. All the three pipes are opened in the beginning. After 10 hrs. Z is closed. In how much time, will the tank be full ?

A. 12 hrs
B. 14 hrs
C. 16 hrs
D. 18 hrs

8 men can dig a pit in 20 days. If a man works half as much again as a boy, then 4 men and 9 boys can dig a similar pit in:__________?

A. 12 days
B. 16 days
C. 18 days
D. 20 days